civil engineering
NYS 30, RECONSTRUCTION,
MIDDLEBURG, NY, $3.000 M
Mr. Doak led the design team to a Context Sensitive Design Award in this highway reconstruction through the historic village of Middleburg just 30 miles from downtown Albany. We were challenged to retain the slate sidewalks as required by SHPO while complying with ADA requirements. The waterline was directional drilled to reduce impacts to the trees and charm of the historic neighborhood.
location: middleburg, NY
Matthews Floor Plan
Tony’s Gas Station
AIRTHO CLEAN ROOM
Chaffee Storage Units
ANAGNOSTAKOS
100 Chenango Bridge
80 Walnut
STERLING BRIDGE
CHENANGO STREET SIDEWALK
BRIDGEWATER LOADING DOCK
Richfield Springs
NYS 30, RECONSTRUCTION, MIDDLEBURG, NY, $3.000 M
NYS 17C, JOHNSON CITY, MILL/FILL & SIDEWALK, NY, $6.000 M
NYS 96/CATATONK CREEK, BRIDGE, CANDOR, NY, $5.000 M
NYS 52,52A &17B, GUIDE RAIL, SULLIVAN COUNTY NY, $6.000 M
NYS 52 & 52A RECONSTRUCTION, LIBERTY NY, $12.000 M
NYS 26 & 17C RECONSTRUCTION, ENDICOTT